01 Jul 2008 11:58 AM:
Regarding the small phase 6 pool by Mejorana 10 I have just returned from HRGR after 2 weeks. Our pool is filled and looking very enticing and was at the call centre every other day regarding the anticipated opening. On Friday 27th two pool engineers came to work on it. As I don't speak Spanish fluently we had quite an interesting conversation with a lot of sign language, however the upshot is that there is no power to the pool. Without this power they cannot set the filters or pumps working. Once this is done and the chemicals are introduced I think the engineer said 2-2 1/2 hours
It would appear that there may be some major electrical problem in this area as we did not have stair lights in Indico 7 for the duration of our stay. Again we were at the call centre regarding this every other day but to no avail.
Our daughter will be out there for another 10 days so if there is any movement in this direction I will report.
Steve